| Andhra Pradesh | Adilabad Power Station Unit 1 | Singareni Collieries | 600 | 3,548,220 | | 2012 | Construction |
| Andhra Pradesh | Adilabad Power Station Unit 2 | Singareni Collieries | 600 | 3,548,220 | 0 | 2016 | Early development |
| Andhra Pradesh | Adilibad power station (Shalivahana Power Corp.) | Shalivahana Power Corp. | 300 | 1,774,110 | | | Uncertain |
| Andhra Pradesh | Ankulapatur power station phase 1 | VSF Projects | 350 | 2,069,795 | Supercritical | | Construction |
| Andhra Pradesh | Ankulapatur power station phase 2 | VSF Projects | 135 | 798,350 | Supercritical | | Proposed |
| Andhra Pradesh | Bander power station Phase-I | Thermal Powertech Corporation | 660 | 3,903,043 | Supercritical | 2013 | Construction |
| Andhra Pradesh | Bander power station Phase-II | Thermal Powertech Corporation | 660 | 3,903,043 | Supercritical | 2013 | Construction |
| Andhra Pradesh | Bhavanapadu Thermal Power Project (Kakarapalle) | East Coast Energy | 2640 | 15,612,170 | Supercritical | | Deferred |
| Andhra Pradesh | Bhavavipuram Cement power station | Deccan Cements | 18 | 106,447 | | | Construction |
| Andhra Pradesh | Budele power station | Indu Projects Limited | 1000 | 5,913,701 | | | Unconfirmed |
| Andhra Pradesh | Damodaram Sanjeevaiah Thermal Power Station (Krishanpatnam) | Andhra Pradesh Power Generation Corporation (APGENCO) | 1600 | 9,461,921 | | | Cancelled |
| Andhra Pradesh | Dharmavaram power station | Nava Bharat Ventures Ltd | 150 | 887,055 | | | Deferred |
| Andhra Pradesh | Dr. RKP Power Ankulapatur power station phase 1 | Dr. RKP Power | 130 | 768,781 | | | Advanced development |
| Andhra Pradesh | Dr. RKP Power Ankulapatur power station phase 2 | Dr. RKP Power | 300 | 1,774,110 | | | Advanced development |
| Andhra Pradesh | Garividi power station | Facor Power | 45 | 266,117 | | | Construction |
| Andhra Pradesh | Gopuvanipalam Megal Thermal Power Project (Chinnapuram, Machilipatnam) | Nagarjuna Construction Company | 1980 | 11,709,128 | Supercritical | | Unconfirmed |
| Andhra Pradesh | Gudur Thermal Power Project (Momidi) Phase I | Pragdisa Power Private Ltd | 1320 | 7,806,085 | Supercritical | | Proposed |
| Andhra Pradesh | Gudur Thermal Power Project (Momidi) Phase II | Pragdisa Power Private Ltd | 1320 | 7,806,085 | Supercritical | | Proposed |
| Andhra Pradesh | Gunipudi power station (NBPL proposal) | Namratha Bizili Private Limited | 300 | 1,774,110 | | | Deferred |
| Andhra Pradesh | Gunipudi power station (STEAPL proposal) | Suryachakra Group | 1320 | 7,806,085 | Ultra Supercritical | | Advanced development |
| Andhra Pradesh | Hinduja Power Plant | Hinduja National Power Corporation | 1040 | 6,150,249 | | | Deferred |
| Andhra Pradesh | Hindupur power station | Sheshadri Power & Infrastructure | 1320 | 7,806,085 | | | Unconfirmed |
| Andhra Pradesh | Jaipur power station | Singareni Collieries | 600 | 3,548,220 | | 2013 | Construction |
| Andhra Pradesh | Jharapudi power station | Suryachakra Group | 0 | - | | | Unconfirmed |
| Andhra Pradesh | Kakatiya Thermal Power Project Stage-II | Andhra Pradesh Power Generation Corporation (APGENCO) | 600 | 3,548,220 | | 2012 | Construction |
| Andhra Pradesh | Kineta Power Stage I (Krishnapatnam) | Kineta Power Limited | 1320 | 7,806,085 | Supercritical | | Advanced development |
| Andhra Pradesh | Kineta Power Stage II (Krishnapatnam) | Kineta Power Limited | 660 | 3,903,043 | Supercritical | | Proposed |
| Andhra Pradesh | Komarada power station | Alfa Infraprop Pvt. Ltd. | 2640 | 15,612,170 | Supercritical | | Proposed |
| Andhra Pradesh | Kothagudum Phase V Unit 10 | Andhra Pradesh Power Generation Corporation (APGENCO) | 500 | 2,956,850 | | 2011 | Operating |
| Andhra Pradesh | Kothagudum TPS expansion | Andhra Pradesh Power Generation Corporation (APGENCO) | 800 | 4,730,961 | 0 | 0 | Proposed |
| Andhra Pradesh | Krishnapatnam Navayuga thermal station Phase I | Navayuga Power | 1320 | 7,806,085 | Supercritical | 2014 | Advanced development |
| Andhra Pradesh | Krishnapatnam Navayuga thermal station Phase II | Navayuga Power | 660 | 3,903,043 | Supercritical | 0 | Proposed |
| Andhra Pradesh | Krishnapatnam Ultra Mega Power Project 1-2 | Reliance Power | 1320 | 7,806,085 | | 2013 | Deferred |
| Andhra Pradesh | Krishnapatnam Ultra Mega Power Project 3-6 | Reliance Power | 2640 | 15,612,170 | | 2015 | Deferred |
| Andhra Pradesh | Latchayapeta power station | NCS Sugars Ltd. | 600 | 3,548,220 | | | Proposed |
| Andhra Pradesh | Lovapalem power station | My Home Power Ltd. | 1000 | 5,913,701 | | | Unconfirmed |
| Andhra Pradesh | Meenakshi Energy Thermal Power Project Phase-I | Meenakshi Energy | 540 | 3,193,398 | | 2010 | Operating |
| Andhra Pradesh | Meenakshi Energy Thermal Power Project Phase-II | Meenakshi Energy | 1320 | 7,806,085 | | | Proposed |
| Andhra Pradesh | Meghavaram Kakarapalli power station | Meghavaram Power | 450 | 2,661,165 | | | Deferred |
| Andhra Pradesh | Meherpur power station | Usha Martin | 1200 | 7,096,441 | | | Early development |
| Andhra Pradesh | Muthukur Mandal power station (Painampuram) | Nelcast Energy Corporation Ltd | 1320 | 7,806,085 | Supercritical | | Early development |
| Andhra Pradesh | Nagarjuna Construction Company Sompeta Thermal Plant | Nagarjuna Construction Company | 2640 | 15,612,170 | | | Deferred |
| Andhra Pradesh | NCC Vamsadhara Mega Power Project Units 1 & 2 | Nagarjuna Construction Company | 1320 | 7,806,085 | | | Early development |
| Andhra Pradesh | NCC Vamsadhara Mega Power Project Units 3 & 4 | Nagarjuna Construction Company | 1320 | 7,806,085 | | | Proposed |
| Andhra Pradesh | Ontimavadi power station | GMR Energy | 6300 | 37,256,315 | | | Early development |
| Andhra Pradesh | Paloncha power station expansion #1 | Nava Bharat Ventures Ltd | 150 | 887,055 | | 0 | Early development |
| Andhra Pradesh | Paloncha power station expansion #2 | Nava Bharat Ventures Ltd | 150 | 887,055 | | | Proposed |
| Andhra Pradesh | Pegadapalli (Jaipur Mandal) power station | Singareni Collieries | 600 | 3,548,220 | | | Construction |
| Andhra Pradesh | Pentakota power station | Namratha Bizili Private Limited | 150 | 887,055 | | | Deferred |
| Andhra Pradesh | Pentakota power station (Srinivasam Energy) | Srinivasam Energy Limited | 1320 | 7,806,085 | Supercritical | | Unconfirmed |
| Andhra Pradesh | Pudimadaka Ultra Mega Power Project | NTPC | 4000 | 23,654,803 | Supercritical | | Advanced development |
| Andhra Pradesh | Ramagundam Stage-IV | NTPC | 1000 | 5,913,701 | | | Early development |
| Andhra Pradesh | Rayalaseema Thermal Power Project Stage-III (Unit 5) | Andhra Pradesh Power Generation Corporation (APGENCO) | 210 | 1,241,877 | | 2010 | Operating |
| Andhra Pradesh | Rayalaseema Thermal Power Project Stage-IV (Unit 6) | Andhra Pradesh Power Generation Corporation (APGENCO) | 600 | 3,548,220 | | 2014 | Advanced development |
| Andhra Pradesh | Saggonda power station | Andhra Sugars | 120 | 709,644 | | | Proposed |
| Andhra Pradesh | Sattupally Thermal Power Station | Andhra Pradesh Power Generation Corporation (APGENCO) | 600 | 3,548,220 | | | Early development |
| Andhra Pradesh | Sigma Infrarop power station (Khamman) | Sigma Infrarop Ltd | 2640 | 15,612,170 | | | Unconfirmed |
| Andhra Pradesh | Simhadri power station unit 3 | NTPC | 500 | 2,956,850 | | 2011 | Operating |
| Andhra Pradesh | Simhadri power station unit 4 | NTPC | 500 | 2,956,850 | | 0 | Proposed |
| Andhra Pradesh | SKIL Group Thermal Power Project (Kotpally) | Sai Krisnodaya Industries Pvt Ltd | 600 | 3,548,220 | | | Unconfirmed |
| Andhra Pradesh | Sompeta power station (Suryachakra) | Suryachakra Group | 1200 | 7,096,441 | | | Unconfirmed |
| Andhra Pradesh | Sree Siva Satyadeva Power Plant | Sree Siva Satyadeva Power Plant Pvt. | 2000 | 11,827,402 | | | Cancelled |
| Andhra Pradesh | Sri Damodaram Sanjeevaiah (Krishnapatnam) Thermal Power Station | Andhra Pradesh Power Generation Corporation (APGENCO) | 1600 | 9,461,921 | | 2012 | Construction |
| Andhra Pradesh | Srikakulam Thermal Power Station | Andhra Pradesh Power Generation Corporation (APGENCO) | 2400 | 14,192,882 | | | Early development |
| Andhra Pradesh | Thamminapatnam power station (Simhapuri) Phase-I | Simhapuri Energy | 300 | 1,774,110 | Subcritical | 2012 | Construction |
| Andhra Pradesh | Thamminapatnam power station (Simhapuri) Phase-II | Simhapuri Energy | 300 | 1,774,110 | Subcritical | 2012 | Construction |
| Andhra Pradesh | Thamminapatnam power station (Simhapuri) Phase-III | Simhapuri Energy | 1320 | 7,806,085 | Supercritical | 2013 | Construction |
| Andhra Pradesh | Uppada power station | Spectrum Power Generation | 1320 | 7,806,085 | | | Proposed |
| Andhra Pradesh | Varadevu Ultra Mega Power Project Stage I | Andhra Pradesh Power Generation Corporation (APGENCO) | 1600 | 9,461,921 | | | Early development |
| Andhra Pradesh | Vadarevu Ultra Mega Power Project Stages II-III | Andhra Pradesh Power Generation Corporation (APGENCO) | 2400 | 14,192,882 | | | Proposed |
| Andhra Pradesh | VBF Ferro Alloys Bodepalli plant | VBC Ferro Alloys | 120 | 709,644 | | | Proposed |
| Andhra Pradesh | Vijayawada Thermal Power Station (IGCC) | Andhra Pradesh Power Generation Corporation (APGENCO) | 182 | 1,076,294 | IGCC | 2014 | Early development |
| Andhra Pradesh | Vijawada Thermal Power Station expansion | Andhra Pradesh Power Generation Corporation (APGENCO) | 800 | 4,730,961 | | 0 | Proposed |
| Andhra Pradesh | Vikas Power thermal plant | Vikas Power | 540 | 3,193,398 | | | Proposed |
| Andhra Pradesh | Welspun Andhra Pradesh project | Welspun Energy | 1320 | 7,806,085 | Supercritical | 0 | Early development |
| Assam | Bongaigaon NTPC power station Stage I | NTPC | 750 | 4,435,276 | | | Construction |
| Assam | Bongaigaon NTPC power station Stage II | NTPC | 250 | 1,478,425 | | | Proposed |
| Assam | Borgolai power station | Assam Power Projects Development Company Ltd | 250 | 1,478,425 | | | Proposed |
| Assam | Garo Hills power station | NEEPCO | 500 | 2,956,850 | | | Proposed |
| Assam | Margherita power station | NEEPCO]] and [[APGCL | 480 | 2,838,576 | | | Proposed |
| Assam | Naitor power station | Globe Power & Steel | 1320 | 7,806,085 | | | Proposed |
| Assam | West Khasi Hills power station | NEEPCO | 240 | 1,419,288 | | | Proposed |
| Bihar | Banka power station | Abhijeet Group | 3960 | 23,418,255 | | | Deferred |
| Bihar | Banka Thermal Power Plant (BSEB) | Jas Infrastructure Capital Pvt Ltd]] with [[Bihar State Electricity Board | 2640 | 15,612,170 | | 2016 | Proposed |
| Bihar | Barauni power station expansion | Bihar State Electricity Board | 500 | 2,956,850 | | 2014 | Early development |
| Bihar | Barh I power station | NTPC | 1980 | 11,709,128 | | | Construction |
| Bihar | Barh II power station | NTPC | 1320 | 7,806,085 | Supercritical | | Construction |
| Bihar | Bhagalpur Power Project | Adhunik Power and Natural Resources | 2640 | 15,612,170 | | | Proposed |
| Bihar | Bihar Sponge Iron power station | Modi Group | 25 | 147,843 | | | Proposed |
| Bihar | Buxar Thermal Power Station (Chausa) | Buxar Bijlee Company | 1320 | 7,806,085 | | 2016 | Proposed |
| Bihar | Chausa power station | Krishak Bharti Co-operative Ltd. | 1320 | 7,806,085 | | | Proposed |
| Bihar | Ganga Power & Natural Resources power station | Ganga Power & Natural Resources | 1320 | 7,806,085 | | 2016 | Proposed |
| Bihar | Indragachi power station | India Power Corporation | 1320 | 7,806,085 | | | Proposed |
| Bihar | Jagdishpur power station | AES India | 2640 | 15,612,170 | | | Proposed |
| Bihar | Kahalgaon power station | Cement Manufacturing Company Ltd. | 500 | 2,956,850 | | | Proposed |
| Bihar | Kahalgaon power station (East-West Power) | East-West Power Generation Co. Ltd. | 1000 | 5,913,701 | | | Proposed |
| Bihar | Kahalgaon power station (Sarvottam) | Sarvottam Infrastructure Pvt. Ltd. | 540 | 3,193,398 | | | Proposed |
| Bihar | Kahalgaon Super Thermal Power Plant St-III Extension | NTPC | 500 | 2,956,850 | | | Proposed |
| Bihar | Kiul Thermal Power Project (Lakhisarai) | Mirach Power Pvt. Ltd | 1320 | 7,806,085 | | | Proposed |
| Bihar | Kochar power station | Triton Energy Ltd. | 1320 | 7,806,085 | | | Proposed |
| Bihar | Lakhisarai power station (Subhas Projects & Marketing) | Subhas Projects & Marketing Ltd | 1200 | 7,096,441 | | | Proposed |
| Bihar | Lakhisarai Thermal Power Station (Kajara) | Lakhisarai Bijlee | 1320 | 7,806,085 | | 2016 | Advanced development |
| Bihar | Muzaffarpur power station extension | Bihar State Electricity Board | 390 | 2,306,343 | | 2013 | Construction |
| Bihar | Nabinagar (Majhiyan) Super Thermal Power Project | Nabinagar Power Generating Company | 1980 | 11,709,128 | Supercritical | 2016 | Construction |
| Bihar | Nabinagar I power station | NTPC]] and [[Ministry of Railways | 1000 | 5,913,701 | | | Construction |
| Bihar | Nalanda power station | Nalanda Power Company Ltd | 2000 | 11,827,402 | | 2016 | Proposed |
| Bihar | Pirpainti power station (Essar) | Essar Energy | 1800 | 10,644,661 | | | Uncertain |
| Bihar | Pirpainti Thermal Power Station | Pirpainti Bijlee Company | 1320 | 7,806,085 | | 2016 | Early development |
| Bihar | Prabhawati Nagar power station | Arrissan Power Limited | 1320 | 7,806,085 | | | Early development |
| Bihar | Sirdala power station | Global Powmin | 2640 | 15,612,170 | | 2014 | Early development |
| Bihar | South Pirpainti Thermal Power Station | Nalanda Power Company | 2000 | 11,827,402 | | | Early development |
| Chhattisgarh | Akaltara Ultra Mega Power Project | Akaltara Power | 4000 | 23,654,803 | | | Deferred |
| Chhattisgarh | Amarkantak Power Phase I (Pathadi) | Lanco | 600 | 3,548,220 | | | Operating |
| Chhattisgarh | Amarkantak Power Phase II (Pathadi) unit 3 | Lanco | 660 | 3,903,043 | Supercritical | 2013 | Construction |
| Chhattisgarh | Amarkantak Power Phase II (Pathadi) unit 4 | Lanco | 660 | 3,903,043 | Supercritical | 2014 | Construction |
| Chhattisgarh | Amoda power station | DCM Shriram Consolidated | 600 | 3,548,220 | | | Early development |
| Chhattisgarh | Arasmeta Expansion Power Plant | KSK Energy Ventures | 43 | 254,289 | | | Construction |
| Chhattisgarh | Athena Chhattisgarh power station | Athena Chhattisgarh Power Limited | 1200 | 7,096,441 | | | Proposed |
| Chhattisgarh | Avantha Bhandar power station | Avantha Power and Infrastructure | 1200 | 7,096,441 | | 0 | Early development |
| Chhattisgarh | Baiso power station (Janjgir-Champa) | KVK Power & Infrastructure Pvt. Ltd. | 1200 | 7,096,441 | | | Proposed |
| Chhattisgarh | BALCO Korba power station expansion | Bharat Aluminum Company (BALCO) | 1200 | 7,096,441 | | | Construction |
| Chhattisgarh | Balpur power station | Jain Energy | 1200 | 7,096,441 | | | Early development |
| Chhattisgarh | Baradarha power station | DB Power | 1200 | 7,096,441 | | | Advanced development |
| Chhattisgarh | Bhaiyathan Thermal Power Project | Indiabulls Power | 1320 | 7,806,085 | | | Proposed |
| Chhattisgarh | Bhandhakhar power station | Maruti Clean Coal and Power | 300 | 1,774,110 | | | Advanced development |
| Chhattisgarh | Bhengari power station | Mahavir Global Coal Limited (MGCL) | 540 | 3,193,398 | | | Proposed |
| Chhattisgarh | Bhushan Steel Chhattisgarh project | Bhushan Steel | 1000 | 5,913,701 | | | Early development |
| Chhattisgarh | Birra Thermal Power Project | Moser Baer Power & Infrastructures | 1320 | 7,806,085 | | | Early development |
| Chhattisgarh | BLA Chhattisgarh power station | BLA Power | 540 | 3,193,398 | | | Cancelled |
| Chhattisgarh | Bundeli power station | Chhattisgarh State Power Generating Corporation | 1000 | 5,913,701 | | | Proposed |
| Chhattisgarh | Chakabura power station expansion | ACB (India) | 270 | 1,596,699 | | 2011 | Construction |
| Chhattisgarh | Champa Adhunik power station | Adhunik Power and Natural Resources | 1320 | 7,806,085 | | | Proposed |
| Chhattisgarh | Champa Power Project | ACB (India) | 1200 | 7,096,441 | | | Early development |
| Chhattisgarh | Chhattisgarh GMR power station Phase I | GMR Energy | 1370 | 8,101,770 | | 2014 | Advanced development |
| Chhattisgarh | Chhattisgarh GMR power station Phase II | GMR Energy | 685 | 4,050,885 | | 2015 | Early development |
| Chhattisgarh | Dhardai power station | Ispat Industries | 1200 | 7,096,441 | | | Proposed |
| Chhattisgarh | Facor Power Chhattisgarh power project | Facor Power | 600 | 3,548,220 | Supercritical | | Early development |
| Chhattisgarh | Gorra Thermal Power Plant | Patni Power Projects | 540 | 3,193,398 | | | Proposed |
| Chhattisgarh | Janjgir power station | Karnataka Power Corporation | 1200 | 7,096,441 | | 2013 | Proposed |
| Chhattisgarh | Khamhar power station | AES Chhattisgarh Energy | 1440 | 8,515,729 | | | Proposed |
| Chhattisgarh | Korba III power station | NTPC | 500 | 2,956,850 | | 2010 | Operating |
| Chhattisgarh | Korba South power station Unit 1 | Chhattisgarh State Power Generating Corporation | 500 | 2,956,850 | | 2012 | Proposed |
| Chhattisgarh | Korba South power station Unit 2 | Chhattisgarh State Power Generating Corporation | 500 | 2,956,850 | | 2013 | Proposed |
| Chhattisgarh | KSK Mahanadi Power Project | KSK Energy Ventures | 3600 | 21,289,323 | | | Construction |
| Chhattisgarh | KSK Narmada Power Project | KSK Energy Ventures | 1800 | 10,644,661 | | | Early development |
| Chhattisgarh | Lanro Chhattisgarh Thermal Power Project | Lanco | 2400 | 14,192,882 | | | Proposed |
| Chhattisgarh | Lara Integrated Thermal Power Project 1-2 | NTPC | 1600 | 9,461,921 | Supercritical | 2014 | Proposed |
| Chhattisgarh | Lara Integrated Thermal Power Project 3-4 | NTPC | 1600 | 9,461,921 | Supercritical | 2015 | Proposed |
| Chhattisgarh | Lara Integrated Thermal Power Project 5 | NTPC | 800 | 4,730,961 | Supercritical | 2016 | Proposed |
| Chhattisgarh | Lohakhan power station | Jindal India Thermal Power | 1100 | 6,505,071 | | | Proposed |
| Chhattisgarh | Moser Baer Captive Power Project | Moser Baer Power & Infrastructures]] and [[PTC India | 150 | 887,055 | 0 | 0 | Early development |
| Chhattisgarh | Nawapara power station | BGR Energy Systems | 600 | 3,548,220 | | 2015 | Early development |
| Chhattisgarh | Pathadi power station | Lanco]] and [[KVK | 1320 | 7,806,085 | | | Construction |
| Chhattisgarh | Raigarh Power Project | ACB (India) | 600 | 3,548,220 | | 2013 | Advanced development |
| Chhattisgarh | Raigarh project (VISA Power) | VISA Power | 1200 | 7,096,441 | | 2013 | Advanced development |
| Chhattisgarh | Raigarh Super Thermal project (JSW) | JSW Energy | 1200 | 7,096,441 | | | Uncertain |
| Chhattisgarh | Raigarh power station (SKS Ispat) | SKS Ispat and Power | 1200 | 7,096,441 | | | Early development |
| Chhattisgarh | Raikhera power station | GMR Energy | 1370 | 8,101,770 | | 2014 | Advanced development |
| Chhattisgarh | Raipur thermal power plant | JSW Energy | 1320 | 7,806,085 | Supercritical | | Advanced development |
| Chhattisgarh | Ratija Power Project Phase I | ACB (India) | 50 | 295,685 | | 2011 | Construction |
| Chhattisgarh | Ratija Power Project Phase II | ACB (India) | 50 | 295,685 | 0 | 0 | Early development |
| Chhattisgarh | Sapin power station | Topworth Energy | 1200 | 7,096,441 | | | Early development |
| Chhattisgarh | Sapos power station (Suryachakra) | Suryachakra Group | 1320 | 7,806,085 | Ultra Supercritical | | Advanced development |
| Chhattisgarh | Sapos power station (BEC Power) | BEC Power | 500 | 2,956,850 | | | Early development |
| Chhattisgarh | Sarguja Ultra Mega Power Project | not selected | 4000 | 23,654,803 | | 0 | Proposed |
| Chhattisgarh | Satna Power station (Korba) | KVK Energy | 1485 | 8,781,846 | | | Proposed |
| Chhattisgarh | Sipat I power station | NTPC | 1980 | 11,709,128 | | | Construction |
| Chhattisgarh | SV Power project (Renki) phase II | SV Power Pvt. Ltd. | 300 | 1,774,110 | | | Early development |
| Chhattisgarh | Tamnar II Project | Jindal Power | 2400 | 14,192,882 | Subcritical | | Early development |
| Gujarat | Akrimota power station | Gujarat Mineral Development Corporation | 250 | 1,478,425 | | | Unconfirmed |
| Gujarat | Amreli power station | Avantha Power and Infrastructure | 1320 | 7,806,085 | Supercritical | 2016 | Proposed |
| Gujarat | Pipavav power station | Torrent Power]] and [[Gujarat Power Corporation | 2000 | 11,827,402 | | | Early development |
| Gujarat | Bhadreshwar Thermal Power Project (Adani) | Adani Power | 3300 | 19,515,213 | | | Proposed |
| Gujarat | Bhadreshwar power station (OPG) | OPG Power Ventures | 300 | 1,774,110 | 0 | 0 | Deferred |
| Gujarat | Bharuch DCM power station | DCM Shriram Consolidated | 48 | 283,858 | | | Proposed |
| Gujarat | Bhavnagar power station | Gujarat Power Corporation | 375 | 2,217,638 | | | Advanced development |
| Gujarat | Bherai power station | VISA Power | 1320 | 7,806,085 | | | Early development |
| Gujarat | Dahej power station (JSW Energy) | JSW Energy | 2400 | 14,192,882 | | | Proposed |
| Gujarat | Dahej Thermal Power Project | Adani Power | 2640 | 15,612,170 | | | Early development |
| Gujarat | Dholera Power Plant | Gujarat State Electricity Corp | 1600 | 9,461,921 | | 2018 | Proposed |
| Gujarat | Dhuvaran Super Thermal Power Project | NTPC | 1320 | 7,806,085 | | | Proposed |
| Gujarat | GMR Energy coal plant | GMR Energy | 1800 | 10,644,661 | | | Unconfirmed |
| Gujarat | Gujarat Power Project (Valia) | Neyveli Lignite Corporation | 500 | 2,956,850 | | | Proposed |
| Gujarat | Hazira II power plant | Essar Energy | 270 | 1,596,699 | | | Construction |
| Gujarat | Jamnagar Complex power station | Reliance Industries | 1000 | 5,913,701 | | | Proposed |
| Gujarat | Mundra Thermal Power Project (Adani) Phase I Unit 1 | Adani Power | 330 | 1,951,521 | Subcritical | 2009 | Operating |
| Gujarat | Mundra Thermal Power Project (Adani) Phase I Unit 2 | Adani Power | 330 | 1,951,521 | Subcritical | 2010 | Operating |
| Gujarat | Mundra Thermal Power Project (Adani) Phase II Unit 3-4 | Adani Power | 660 | 3,903,043 | Subcritical | 2010 | Operating |
| Gujarat | Mundra Thermal Power Project (Adani) Phase III Unit 5-6 | Adani Power | 1320 | 7,806,085 | Supercritical | 2011 | Operating |
| Gujarat | Mundra Thermal Power Project (Adani) Phase IV Unit 7 | Adani Power | 660 | 3,903,043 | Supercritical | 2011 | Operating |
| Gujarat | Mundra Thermal Power Project (Adani) Phase IV Unit 8-9 | Adani Power | 660 | 3,903,043 | Supercritical | 2012 | Construction |
| Gujarat | Salaya I power plant | Essar Energy | 1200 | 7,096,441 | | 2012 | Operating |
| Gujarat | Salaya II power plant | Essar Energy | 1200 | 7,096,441 | | | Construction |
| Gujarat | Salaya III power plant | Essar Energy | 600 | 3,548,220 | | | Construction |
| Gujarat | Sikka Thermal Power Station Units 3-4 | Gujarat State Electricity Corp | 500 | 2,956,850 | | 2013 | Construction |
| Gujarat | Simar power station | JSW Energy | 1600 | 9,461,921 | | | Cancelled |
| Gujarat | Suryachakra captive power plant | Suryachakra Group | 200 | 1,182,740 | | | Early development |
| Gujarat | Surat Lignite Ext Units 3-4 | Gujarat Industries | 250 | 1,478,425 | | 2011 | Operating |
| Gujarat | Tata Mundra Ultra Mega Power Project 1 | Tata Power | 800 | 4,730,961 | Supercritical | 2012 | Operating |
| Gujarat | Tata Mundra Ultra Mega Power Project 2-3 | Tata Power | 1600 | 9,461,921 | Supercritical | 2013 | Construction |
| Gujarat | Tata Mundra Ultra Mega Power Project 4-5 | Tata Power | 1600 | 9,461,921 | Supercritical | 2014 | Advanced development |
| Gujarat | Ukai Thermal Power Station Unit 6 | Gujarat State Electricity Corp | 500 | 2,956,850 | | 2012 | Construction |
| Gujarat | Wanakbori Thermal Power Station Unit 8 | Gujarat State Electricity Corp | 800 | 4,730,961 | | 2016 | Early development |
| Haryana | Deenbandhu Chhotu Ram Thermal Power Plant expansion | Haryana Power Generation Company | 660 | 3,903,043 | | | Proposed |
| Haryana | Indira Gandhi Super Thermal Power Project Unit 3 | NTPC | 500 | 2,956,850 | Subcritical | 2012 | Construction |
| Haryana | Indira Gandhi Super Thermal Power Project Units 1-2 | NTPC | 1000 | 5,913,701 | Subcritical | 2011 | Operating |
| Haryana | Jhajjar power station | CLP India | 1320 | 7,806,085 | | 2012 | Construction |
| Haryana | Karchana Thermal Power Project | Jaiprakash Power Ventures | 1980 | 11,709,128 | | | Construction |
| Haryana | Mahatma Gandhi Thermal Power Project | Haryana Power Generation Company | 1320 | 7,806,085 | | 2012 | Advanced development |
| Haryana | Rajiv Gandhi Thermal Power Project Hisar Unit I | Haryana Power Generation Company | 600 | 3,548,220 | | 2010 | Operating |
| Haryana | Rajiv Gandhi Thermal Power Project Hisar Unit II | Haryana Power Generation Company | 600 | 3,548,220 | | 2011 | Operating |
| Jharkhand | Baranda power station | JSW Energy | 1620 | 9,580,195 | | | Early development |
| Jharkhand | Bhagapur power station | Gagan Power & Natural Resources | 1320 | 7,806,085 | | | Early development |
| Jharkhand | Bokaro A Thermal Power Station | Damodar Valley Corporation | 600 | 3,548,220 | | | Construction |
| Jharkhand | Bokaro Steel City Thermal Power Station | Damodar Valley Corporation | 750 | 4,435,276 | | | Proposed |
| Jharkhand | Chandil Singh power station | HDIL Energy | 1320 | 7,806,085 | Supercritical | | Unconfirmed |
| Jharkhand | Chandrapura power station | Damodar Valley Corporation | 500 | 2,956,850 | | | Construction |
| Jharkhand | Chandwa Power Project Phase I | Abhijeet Group | 1080 | 6,386,797 | Subcritical | 2014 | Construction |
| Jharkhand | Chandwa Power Project Phase II | Abhijeet Group | 675 | 3,991,748 | | | Early development |
| Jharkhand | Chandwa Power Project Phase III | Abhijeet Group | 660 | 3,903,043 | | | Early development |
| Jharkhand | Chichro Patsimla power station | NTPC]] & [[Coal India | 2000 | 11,827,402 | | | Proposed |
| Jharkhand | Dumka Project | Jindal Power | 1300 | 7,687,811 | | 2014 | Early development |
| Jharkhand | Godda Project | Jindal Power | 660 | 3,903,043 | Supercritical | | Advanced development |
| Jharkhand | Jamshedpur Kandra power station units 1-2 | Adhunik Power and Natural Resources | 540 | 3,193,398 | Subcritical | 2012 | Construction |
| Jharkhand | Jamshedpur Kandra power station second stage | Adhunik Power and Natural Resources | 540 | 3,193,398 | 0 | 0 | Proposed |
| Jharkhand | Jharkhand Aluminium power station | Hindalco Industries | 900 | 5,322,331 | | | Early development |
| Jharkhand | Jharkhand Project | Jindal Power | 2640 | 15,612,170 | | | Proposed |
| Jharkhand | Jojobera Power Plant unit 5 | Tata Power | 120 | 709,644 | | 2011 | Operating |
| Jharkhand | Gumla power station (Kamdara) | Jharkhand State Electricity Board | 1320 | 7,806,085 | 0 | 0 | Early development |
| Jharkhand | KVK Jharkhand project | KVK Nilachal Power Pvt. Ltd. | 1000 | 5,913,701 | | | Early development |
| Jharkhand | Kamdara power station | Jharkhand State Electricity Board | 1320 | 7,806,085 | 0 | 0 | Early development |
| Jharkhand | Maithon Right Bank Thermal Power Station | Raithon Power]] and [[Tata Power | 1000 | 5,913,701 | | 2011 | Operating |
| Jharkhand | Maithon Right Bank Thermal Power Station Phase II | Damodar Valley Corporation | 1600 | 9,461,921 | | | Early development |
| Jharkhand | Malaxmi Mega Thermal Power Project (Thakurbari) | Malaxmi | 2640 | 15,612,170 | | | Unconfirmed |
| Jharkhand | Patratu power station | Jinbhuvish Energy (East) | 1320 | 7,806,085 | 0 | 0 | Proposed |
| Jharkhand | Rahem power station | Gupta Energy | 1000 | 5,913,701 | | | Unconfirmed |
| Jharkhand | Ranchi Thermal Power Project | VISA Power | 2640 | 15,612,170 | | | Early development |
| Jharkhand | Sahibganj power station | Madhucon Projects | 1320 | 7,806,085 | | | Early development |
| Jharkhand | Saraikela power station | Kohinoor Power | 215 | 1,271,446 | | | Construction |
| Jharkhand | Tilaiya Ultra Mega Power Project 1-5 | Reliance Power | 3300 | 19,515,213 | Supercritical | 2015 | Early development |
| Jharkhand | Tilaiya Ultra Mega Power Project 6 | Reliance Power | 660 | 3,903,043 | Supercritical | 2017 | Early development |
| Jharkhand | Tiruldih Power Project | Tata Power | 1980 | 11,709,128 | | | Early development |
| Jharkhand | Tori I power plant | Essar Energy | 1200 | 7,096,441 | | | Construction |
| Jharkhand | Tori II power plant | Essar Energy | 600 | 3,548,220 | | | Construction |
| Karnataka | Bellary OPG power station | OPG Power Ventures | 12 | 70,964 | | | Construction |
| Karnataka | Bellary Thermal Power Station 2 | Karnataka Power Corporation | 500 | 2,956,850 | | 2012 | Construction |
| Karnataka | Bellary Thermal Power Station 3 | Karnataka Power Corporation | 700 | 4,139,591 | | 2014 | Proposed |
| Karnataka | Chamalapura power station | Karnataka Power Corporation | 1000 | 5,913,701 | | | Cancelled |
| Karnataka | Edlapur power station | Karnataka Power Corporation | 800 | 4,730,961 | Supercritical | | Proposed |
| Karnataka | Mangoli power station | Flamingo Energy Ventures | 1320 | 7,806,085 | Supercritical | | Early development |
| Karnataka | Ghataprabha power station | Power Company of Karnataka (PCKL) | 1320 | 7,806,085 | | | Early development |
| Karnataka | Godhna power station | Karnataka Power Corporation | 1600 | 9,461,921 | | | Proposed |
| Karnataka | Gulbara power station | Atlas Power India | 1320 | 7,806,085 | | | Early development |
| Karnataka | Gulbarga power station | Power Company of Karnataka (PCKL) | 1320 | 7,806,085 | | | Early development |
| Karnataka | Hanakon Thermal Power Project | Ind Bharat Power (Karwar) Ltd. | 450 | 2,661,165 | | | Cancelled |
| Karnataka | Hassan power station | Hassan Thermal Power (P) Ltd | 1000 | 5,913,701 | | | Early development |
| Karnataka | Jewargi power station | Jewargi Power Pvt Ltd. | 1320 | 7,806,085 | | | Proposed |
| Karnataka | JSW Vijayanagar power station expansion | JSW Energy | 660 | 3,903,043 | Supercritical | | Early development |
| Karnataka | Kudgi Super Thermal Power Project Stage I | NTPC | 2400 | 14,192,882 | Supercritical | | Advanced development |
| Karnataka | Kudgi Super Thermal Power Project Stage II | NTPC | 1600 | 9,461,921 | Supercritical | | Early development |
| Karnataka | Karnataka Gupta power station | Gupta Power | 1320 | 7,806,085 | 0 | 0 | Unconfirmed |
| Karnataka | Mulwad power station | Luxor Energy | 1320 | 7,806,085 | Supercritical | | Early development |
| Karnataka | Raichur Thermal Power Station expansion | Karnataka Power Corporation | 250 | 1,478,425 | | 2010 | Operating |
| Karnataka | Udupi Power Phase I | Lanco | 600 | 3,548,220 | Subcritical | 2010 | Operating |
| Karnataka | Udupi Power Phase II | Lanco | 600 | 3,548,220 | Subcritical | 2011 | Operating |
| Karnataka | Vadlur power station | Surana Power Ltd | 420 | 2,483,754 | | 2013 | Construction |
| Karnataka | Vantamuri power station | Shree Renuka Energy | 1050 | 6,209,386 | | | Early development |
| Karnataka | Yermarus thermal station | Karnataka Power Corporation | 1600 | 9,461,921 | Supercritical | | Early development |
| Kerala | Kasargod power station | Kerala State Industrial Development Corp. | 2400 | 14,192,882 | Supercritical | | Early development |
| Madhya Pradesh | Anuppor Thermal Power Project Phase 1 | Moser Baer Power & Infrastructures | 1200 | 7,096,441 | | | Construction |
| Madhya Pradesh | Anuppor Thermal Power Project Phase 2 | Moser Baer Power & Infrastructures | 1320 | 7,806,085 | 0 | 0 | Early development |
| Madhya Pradesh | Annupur power station (Newzone) | New Zone India | 1320 | 7,806,085 | Supercritical | 0 | Early development |
| Madhya Pradesh | Banas Thermal Power project (Anuppur) | KVK Power & Infrastructure Pvt. Ltd. | 1320 | 7,806,085 | | | Proposed |
| Madhya Pradesh | Bansagar power station | MPTradco | 1600 | 9,461,921 | Supercritical | 2015 | Early development |
| Madhya Pradesh | Barahi power station | Sudama Mahavir Power | 1320 | 7,806,085 | Supercritical | 2015 | Proposed |
| Madhya Pradesh | Barethi Super Thermal Power Project | NTPC | 3960 | 23,418,255 | | | Early development |
| Madhya Pradesh | Bina Refinery power station | Bharat Oman Refinery | 99 | 585,456 | | | Construction |
| Madhya Pradesh | Bina Thermal Power Project | Jaiprakash Power Ventures | 1250 | 7,392,126 | | 2012 | Construction |
| Madhya Pradesh | Champa-Janjgir power station Unit 1 | ACB (India) | 600 | 3,548,220 | | 2015 | Proposed |
| Madhya Pradesh | Champa-Janjgir power station Unit 2 | ACB (India) | 600 | 3,548,220 | | 2016 | Proposed |
| Madhya Pradesh | Chaunsara power station | Adani Power | 1320 | 7,806,085 | Supercritical | 2013 | Proposed |
| Madhya Pradesh | Chindwara JSW power station | JSW Energy | 1320 | 7,806,085 | | | Proposed |
| Madhya Pradesh | Chitrangi power station | Reliance Power | 3960 | 23,418,255 | Supercritical | | Construction |
| Madhya Pradesh | Dada Dhuniwale Thermal Power Project | M.P. Power Generating Company | 1600 | 9,461,921 | | | Proposed |
| Madhya Pradesh | Gadarwara power station (BLA) | BLA Power | 140 | 827,918 | Subcritical | | Advanced development |
| Madhya Pradesh | Gadarwara Super Thermal Power Project | NTPC | 1320 | 7,806,085 | | | Early development |
| Madhya Pradesh | Jabalpur Thermal Power Project | VISA Power | 1320 | 7,806,085 | | | Early development |
| Madhya Pradesh | Jhabua power station | Chetak Enterprises | 1320 | 7,806,085 | | | Deferred |
| Madhya Pradesh | Mandsaur power station | Chetak Enterprises | 1320 | 7,806,085 | | | Deferred |
| Madhya Pradesh | Jaypee Nigrie Super Thermal Power Project | Jaiprakash Power Ventures | 1320 | 7,806,085 | | 2013 | Construction |
| Madhya Pradesh | Jhabua power station phase 1 | Avantha Power and Infrastructure | 600 | 3,548,220 | Subcritical | 0 | Construction |
| Madhya Pradesh | Jhabua power station phase 2 | Avantha Power and Infrastructure | 660 | 3,903,043 | Supercritical | 0 | Advanced development |
| Madhya Pradesh | Katni power station | Welspun Energy | 1980 | 11,709,128 | Supercritical | | Advanced development |
| Madhya Pradesh | Khargaone power station | NTPC | 0 | - | 0 | 0 | Proposed |
| Madhya Pradesh | Madhya Pradesh Jain Energy power station (Birhulee) | Jain Energy | 1320 | 7,806,085 | | | Early development |
| Madhya Pradesh | Mahan Aluminium power station | Hindalco Industries | 900 | 5,322,331 | | | Construction |
| Madhya Pradesh | Mahan I power plant | Essar Energy | 1200 | 7,096,441 | | 2012 | Construction |
| Madhya Pradesh | Mahan II power plant | Essar Energy | 600 | 3,548,220 | 0 | 0 | Proposed |
| Madhya Pradesh | Maharjapur power station | Sudama Mahavir Power | 1320 | 7,806,085 | 0 | 0 | Early development |
| Madhya Pradesh | Pench Thermal Power Project | Adani Power | 1320 | 7,806,085 | Supercritical | | Advanced development |
| Madhya Pradesh | Sasan Ultra Mega Power Project 1-2 | Reliance Power | 1320 | 7,806,085 | | 2013 | Construction |
| Madhya Pradesh | Sasan Ultra Mega Power Project 3 | Reliance Power | 660 | 3,903,043 | | 2014 | Construction |
| Madhya Pradesh | Sasan Ultra Mega Power Project 4-5 | Reliance Power | 1320 | 7,806,085 | | 2015 | Construction |
| Madhya Pradesh | Sasan Ultra Mega Power Project 6 | Reliance Power | 660 | 3,903,043 | | 2016 | Construction |
| Madhya Pradesh | Satpura Thermal Power Station Units 10-11 | M.P. Power Generating Company | 500 | 2,956,850 | | 2012 | Construction |
| Madhya Pradesh | Shahdol power station (formerly SJK Powergen) | GMR Energy | 1370 | 8,101,770 | | 2014 | Early development |
| Madhya Pradesh | Shahpura power station | MP Power Trading Company Limited | 1500 | 8,870,551 | | | Early development |
| Madhya Pradesh | Shree Singaji Thermal Power Project Stage I Unit 1 | M.P. Power Generating Company | 600 | 3,548,220 | | 2012 | Construction |
| Madhya Pradesh | Shree Singaji Thermal Power Project Stage I Unit 2 | M.P. Power Generating Company | 600 | 3,548,220 | | 2013 | Construction |
| Madhya Pradesh | Shree Singaji Thermal Power Project Stage II | M.P. Power Generating Company | 1320 | 7,806,085 | | | Proposed |
| Madhya Pradesh | Sidhi Power Project | ACB (India) | 1200 | 7,096,441 | | 2014 | Advanced development |
| Madhya Pradesh | Suryachakra Thermal (Madhya Pradesh) | Suryachakra Group | 1320 | 7,806,085 | Supercritical | | Deferred |
| Madhya Pradesh | Vindhyachal-IV power station | NTPC | 1000 | 5,913,701 | | | Construction |
| Madhya Pradesh | Vindhyachal-V power station | NTPC | 500 | 2,956,850 | | | Proposed |
| Madhya Pradesh | Welspun Mega Industrial & Energy Park | Welspun Energy Park Pvt. Ltd. | 5280 | 31,224,340 | | | Early development |
| Maharashtra | Amravati Thermal Power Project Phase I | Indiabulls Power | 1350 | 7,983,496 | | | Construction |
| Maharashtra | Amravati Thermal Power Project Phase II | Indiabulls Power | 1320 | 7,806,085 | 0 | 0 | Proposed |
| Maharashtra | Bela power station | Ideal Energy Projects | 270 | 1,596,699 | | | Construction |
| Maharashtra | Bela power station (Mantri Power) | Mantri Power | 540 | 3,193,398 | 0 | 0 | Proposed |
| Maharashtra | Bhadravati power station (MIDC) | Maharashtra Industrial Development Corporation | 1320 | 7,806,085 | 0 | 0 | Early development |
| Maharashtra | Bhadravati power station (Ispat) | Ispat Group | 2000 | 11,827,402 | 0 | 0 | Proposed |
| Maharashtra | Bela power station | Ideal Energy Projects | 270 | 1,596,699 | | | Construction |
| Maharashtra | Bela power station (Mantri Power) | Mantri Power | 540 | 3,193,398 | 0 | 0 | Proposed |
| Maharashtra | Bhandewadi power station | Nagpur Municipal Corporation | 500 | 2,956,850 | | | Proposed |
| Maharashtra | Bhusawal Thermal Power Station Units 4-5 | Maharashtra State Power Generation Company | 1000 | 5,913,701 | | 2011 | Operating |
| Maharashtra | Bhusawal Thermal Power Station Unit 6 | Maharashtra State Power Generation Company | 660 | 3,903,043 | | | Advanced development |
| Maharashtra | Bijora power station | Jinbhuvish Power Generations | 1260 | 7,451,263 | Subcritical | 0 | Advanced development |
| Maharashtra | Butibori power station | Reliance Power | 600 | 3,548,220 | | 2012 | Construction |
| Maharashtra | Chandrapur Gupta power station stage I | Gupta Energy | 120 | 709,644 | | | Construction |
| Maharashtra | Chandrapur Gupta power station stage 2 | Gupta Energy | 540 | 3,193,398 | | | Advanced development |
| Maharashtra | Chandrapur Thermal Power Station unit 8 | Maharashtra State Power Generation Company | 500 | 2,956,850 | | 2012 | Construction |
| Maharashtra | Chandrapur Thermal Power Station unit 9 | Maharashtra State Power Generation Company | 500 | 2,956,850 | | 2013 | Construction |
| Maharashtra | Coastal Maharashtra Project | Tata Power | 1600 | 9,461,921 | | | Early development |
| Maharashtra | Dahanu power station upgrade | Reliance Infrastructure Limited | 1200 | 7,096,441 | 0 | 0 | Uncertain |
| Maharashtra | Devgad UMPP | NTPC | 4000 | 23,654,803 | | | Proposed |
| Maharashtra | Dhakore power station | Bharat Power | 1050 | 6,209,386 | | | Proposed |
| Maharashtra | Dhariwal power station | Haldia Energy | 600 | 3,548,220 | | | Advanced development |
| Maharashtra | Dhopave coal plant (NTPC) | NTPC | 1600 | 9,461,921 | | | Proposed |
| Maharashtra | Dhopave Thermal Power Station (Mahagenco) Unit 1-3 | Maharashtra State Power Generation Company | 1980 | 11,709,128 | Supercritical | 800 | Advanced development |
| Maharashtra | Dhopave Thermal Power Station (Mahagenco) Unit 4 | Maharashtra State Power Generation Company | 660 | 3,903,043 | Supercritical | 800 | Advanced development |
| Maharashtra | Dondaicha power station Unit 1 | Maharashtra State Power Generation Company | 660 | 3,903,043 | | 2016 | Advanced development |
| Maharashtra | Dondaicha power station Unit 2 | Maharashtra State Power Generation Company | 660 | 3,903,043 | | 2016 | Advanced development |
| Maharashtra | Dondaicha power station Unit 3 | Maharashtra State Power Generation Company | 660 | 3,903,043 | | 2016 | Advanced development |
| Maharashtra | Dondaicha power station Unit 4 | Maharashtra State Power Generation Company | 660 | 3,903,043 | | 2017 | Advanced development |
| Maharashtra | Dondaicha power station Unit 5 | Maharashtra State Power Generation Company | 660 | 3,903,043 | 0 | 0 | Advanced development |
| Maharashtra | EMCO Energy Warora Power Project | EMCO Energy | 600 | 3,548,220 | | 2012 | Construction |
| Maharashtra | Ghuggus power station | Gupta Coalfields & Washeries | 120 | 709,644 | 0 | 0 | Early development |
| Maharashtra | Girye Ultra Mega Power Project | not yet determined | 4000 | 23,654,803 | | | Proposed |
| Maharashtra | GMR Energy coal plant | GMR Energy | 1800 | 10,644,661 | | | Unconfirmed |
| Maharashtra | Khaperkheda TPS Unit 5 | Maharashtra State Power Generation Company | 500 | 2,956,850 | | 2011 | Operating |
| Maharashtra | Kinebodi power station | Nandlal Enterprises | 750 | 4,435,276 | 0 | 0 | Early development |
| Maharashtra | Koradi Thermal Power Station 10 | Maharashtra State Power Generation Company | 660 | 3,903,043 | | 2014 | Construction |
| Maharashtra | Koradi Thermal Power Station 8 | Maharashtra State Power Generation Company | 660 | 3,903,043 | | 2013 | Construction |
| Maharashtra | Koradi Thermal Power Station 9 | Maharashtra State Power Generation Company | 660 | 3,903,043 | | 2014 | Construction |
| Maharashtra | Khursapar power station | Lenexis Energy | 1320 | 7,806,085 | 0 | 0 | Early development |
| Maharashtra | Khutafali power station | Jinbhuvish Power Generations | 1320 | 7,806,085 | 0 | 0 | Early development |
| Maharashtra | Lanco Vidarbha Thermal Power | Lanco | 1320 | 7,806,085 | Supercritical | | Advanced development |
| Maharashtra | Latur power station | Maharashtra State Power Generation Company | 1320 | 7,806,085 | Supercritical | 2016 | Proposed |
| Maharashtra | Mauda-I STPP (Nagpur) | NTPC | 1000 | 5,913,701 | | 2012 | Construction |
| Maharashtra | Mauda-II STPP (Nagpur) | NTPC | 1320 | 7,806,085 | | | Early development |
| Maharashtra | Mendki thermal power project | Maharashtra State Power Generation Company | 1320 | 7,806,085 | | | Proposed |
| Maharashtra | Nasik Thermal Power Project | Indiabulls Power | 1350 | 7,983,496 | | | Early development |
| Maharashtra | Nasik Thermal Power Station (Sinnar) expansion | Maharashtra State Power Generation Company | 1320 | 7,806,085 | Supercritical | 2017 | Early development |
| Maharashtra | Navalakh Umbre power station | Hindustan Electricity Generation Company | 2500 | 14,784,252 | 0 | 0 | Deferred |
| Maharashtra | Paras power station unit 4 | Maharashtra State Power Generation Company | 250 | 1,478,425 | | 2010 | Operating |
| Maharashtra | Parli Thermal Power Station | Maharashtra State Power Generation Company | 250 | 1,478,425 | Subcritical | 2010 | Operating |
| Maharashtra | Rampur coal plant | Finolex | 1000 | 5,913,701 | | | Proposed |
| Maharashtra | Ratnagiri Power Plant | JSW Energy | 1200 | 7,096,441 | | 2011 | Operating |
| Maharashtra | Ratnagiri Power Plant expansion | JSW Energy | 3200 | 18,923,843 | Supercritical | | Deferred |
| Maharashtra | Shahpur Thermal Power Project | Reliance Power | 1200 | 7,096,441 | | | Cancelled |
| Maharashtra | Solapur power station | NTPC | 1320 | 7,806,085 | | 2013 | Proposed |
| Maharashtra | Tadali power station | Dhariwal Infrastructure | 600 | 3,548,220 | 0 | 0 | Advanced development |
| Maharashtra | Tiroda Thermal Power Project | Adani Power | 1960 | 11,590,854 | Supercritical | 2012 | Construction |
| Maharashtra | Tiroda Thermal Power Project second phase | Adani Power | 1370 | 8,101,770 | Supercritical | 0 | Early development |
| Maharashtra | Nardana power station (Vaghode) | Shirpur Power | 300 | 1,774,110 | 0 | 0 | Advanced development |
| Maharashtra | Waral power station | Ind-Barath Power (Konkan) | 450 | 2,661,165 | 0 | 0 | Proposed |
| Maharashtra | Wardha Warora Power Plant Unit 1 | KSK Energy Ventures | 135 | 798,350 | | 2010 | Operating |
| Maharashtra | Wardha Warora Power Plant Units 2-4 | KSK Energy Ventures | 405 | 2,395,049 | 0 | 2011 | Operating |
| Orissa | Aditya Aluminium power station | Hindalco Industries | 900 | 5,322,331 | | | Construction |
| Orissa | Angul I power station (Derang) Unit 1 | Jindal India Thermal Power | 600 | 3,548,220 | | 2012 | Construction |
| Orissa | Angul I power station (Derang) Unit 2 | Jindal India Thermal Power | 600 | 3,548,220 | 0 | 2013 | Construction |
| Orissa | Angul I power station (Derang) Unit 3 | Jindal India Thermal Power | 600 | 3,548,220 | 0 | 0 | Construction |
| Orissa | Angul II power station (Derang) | Jindal India Thermal Power | 1320 | 7,806,085 | | | Construction |
| Orissa | Angul Smelter power station | National Aluminium Company | 360 | 2,128,932 | | | Operating |
| Orissa | Angul Steel power station | Jindal Steel & Power | 810 | 4,790,098 | | 2012 | Construction |
| Orissa | Babandh power station | Lanco | 1320 | 7,806,085 | Supercritical | | Advanced development |
| Orissa | Balangir power station | Sahara India Power Corporation | 1320 | 7,806,085 | | | Early development |
| Orissa | Baragaon power station | Jinbhuvish Power Generations | 1320 | 7,806,085 | 0 | 0 | Early development |
| Orissa | Basundhara power station | Mahanadi Coalfields Limited | 1600 | 9,461,921 | Supercritical | 0 | Early development |
| Orissa | Bhubaneshwar Jasper power station | Bhubaneshwar Power | 135 | 798,350 | | | Proposed |
| Orissa | Brahmani power project | NTPC]] & [[Coal India | 2000 | 11,827,402 | | | Proposed |
| Orissa | Choudwar power station | Indian Metals & Ferro | 150 | 887,055 | | | Construction |
| Orissa | Cuttack power station | VISA Power | 1320 | 7,806,085 | | | Proposed |
| Orissa | Cuttack power station (KVK Nilachal) Phase I | KVK | 350 | 2,069,795 | | 2012 | Construction |
| Orissa | Cuttack power station (KVK Nilachal) Phase II | KVK | 700 | 4,139,591 | | | Proposed |
| Orissa | Darlipali Super Thermal Power Station | NTPC | 1600 | 9,461,921 | Supercritical | | Advanced development |
| Orissa | Derang Thermal Power Project (same as Angul station) | Jindal India Thermal Power | 0 | - | | | 0 |
| Orissa | Gajmara Super Thermal Power Station | NTPC | 1600 | 9,461,921 | | | Advanced development |
| Orissa | Ghogarpalli Ultra Mega Power Project | Power Finance Corporation | 4000 | 23,654,803 | | | Proposed |
| Orissa | IB Thermal Power Station Phase I | Orissa Power Generation Corporation | 1200 | 7,096,441 | | | Proposed |
| Orissa | Jharsuguda CPP power station Units 8 & 9 | Vedanta Resources | 270 | 1,596,699 | | 2011 | Operating |
| Orissa | Jharsuguda Ind-Barath power station | Ind-Barath Energy (Utkal) Ltd. | 700 | 4,139,591 | | | Early development |
| Orissa | Jharsuguda Ind-Barath power station | Ind-Barath Energy (Utkal) Ltd. | 660 | 3,903,043 | 0 | 0 | Proposed |
| Orissa | Jharsuguda Sterlite power station Unit 1 | Sterlite Energy | 600 | 3,548,220 | Subcritical | 2010 | Operating |
| Orissa | Jharsuguda Sterlite power station Unit 2 | Sterlite Energy | 600 | 3,548,220 | Subcritical | 2011 | Operating |
| Orissa | Jharsuguda Sterlite power station Units 3-4 | Sterlite Energy | 1200 | 7,096,441 | Subcritical | 2012 | Construction |
| Orissa | JR Power Project | KSK Energy Ventures | 1980 | 11,709,128 | | | Proposed |
| Orissa | Kamalanga power station | GMR Energy | 1050 | 6,209,386 | | 2012 | Construction |
| Orissa | Kishore Nagar Coal-to-Liquids Project | Jindal Steel & Power | 0 | - | | | Proposed |
| Orissa | Lankahuda power station | NTPC | 0 | - | | | Proposed |
| Orissa | Malibrahmani power station | Monnet Power Company | 1050 | 6,209,386 | Subcritical | | Construction |
| Orissa | Naraj Marthapur power project | Tata Power | 660 | 3,903,043 | | | Proposed |
| Orissa | Navabharat power station | Essar Energy | 1050 | 6,209,386 | | 2014 | Construction |
| Orissa | Navabharat II power station | Essar Energy | 1200 | 7,096,441 | 0 | 0 | Proposed |
| Orissa | Neulapoi power station | CESC Limited | 1200 | 7,096,441 | | | Proposed |
| Orissa | Paradip power plant | Essar Energy | 120 | 709,644 | | | Construction |
| Orissa | Randia power station | Facor Power | 100 | 591,370 | | | Construction |
| Orissa | Rengali power station | Neyveli Lignite Corporation | 2000 | 11,827,402 | | | Proposed |
| Orissa | Sri Ramchandrapur power project | Dr. RKP Power | 120 | 709,644 | | | Proposed |
| Orissa | Srirampur Coal-to-Liquids Project | Strategic Energy Technology Systems | 0 | - | | | Proposed |
| Orissa | Sundargarh Ultra Mega Power Project | NTPC | 4000 | 23,654,803 | | | Proposed |
| Orissa | Talabira thermal station | Neyveli Lignite Corporation]], [[Mahandi Coal Fields | 2000 | 11,827,402 | | | Cancelled |
| Orissa | Talcher Thermal Power Station expansion | NTPC | 500 | 2,956,850 | | | Proposed |
| Orissa | Talcher Super Thermal Power Station expansion | NTPC | 1320 | 7,806,085 | 0 | 0 | Proposed |
| Orissa | Wardha Naini Power Project | KSK Energy Ventures | 1800 | 10,644,661 | | | Proposed |
| Punjab | GHTP Lehra Mohabbat Stage III | Punjab State Electric Board | 1000 | 5,913,701 | | | Operating |
| Punjab | Gidderbaha power station | Punjab State Electric Board | 2640 | 15,612,170 | | | Proposed |
| Punjab | GNDTP Bhathinda Extn. Stage-II | Punjab State Electric Board | 500 | 2,956,850 | | | Proposed |
| Punjab | Goindwal Sahib Thermal Power Plant | GVK | 600 | 3,548,220 | | | Construction |
| Punjab | Goindwal Sahib Thermal Power Plant expansion | GVK | 1320 | 7,806,085 | Supercritical | | Proposed |
| Punjab | Mukerian power station | Punjab State Power Corporation | 1320 | 7,806,085 | 0 | 0 | Early development |
| Punjab | Rajpura Thermal Power Project (Nalash) | Punjab State Power Corporation | 1320 | 7,806,085 | | | Proposed |
| Punjab | Ropar thermal plant expansion | Punjab State Electric Board | 1320 | 7,806,085 | 0 | 0 | Proposed |
| Punjab | Talwandi Sabo Power Project Units 1-3 | Sterlite Energy | 1980 | 11,709,128 | Supercritical | | Construction |
| Punjab | Talwandi Sabo Power Project Unit 4 | Sterlite Energy | 660 | 3,903,043 | Supercritical | 0 | Cancelled |
| Rajasthan | Banswara Cement power station | India Cements | 20 | 118,274 | | | Proposed |
| Rajasthan | Banswara Thermal Power Station | Rajasthan RV Utpadan Nigam | 1320 | 7,806,085 | | | Proposed |
| Rajasthan | Barsingsar Thermal Power Project | Neyveli Lignite Corporation | 375 | 2,217,638 | | | Proposed |
| Rajasthan | Bikaner power station | OM Metals Infraprojects | 700 | 4,139,591 | 0 | 0 | Early development |
| Rajasthan | Bithnok Thermal Power Project | Neyveli Lignite Corporation | 250 | 1,478,425 | | | Proposed |
| Rajasthan | Bithnok thermal station | Neyveli Lignite Corporation | 250 | 1,478,425 | | | Proposed |
| Rajasthan | Chhabra power station | Rajasthan RV Utpadan Nigam | 2080 | 12,300,498 | | | Construction |
| Rajasthan | JSW Barmer (Jalipa Kapurdi) power station units 1-2 | JSW Energy | 270 | 1,596,699 | Subcritical | 2010 | Operating |
| Rajasthan | JSW Barmer (Jalipa Kapurdi) power station units 3-4 | JSW Energy | 270 | 1,596,699 | Subcritical | 2011 | Operating |
| Rajasthan | JSW Barmer (Jalipa Kapurdi) power station units 5-8 | JSW Energy | 540 | 3,193,398 | | 2012 | Construction |
| Rajasthan | JSW Barmer (Jalipa Kapurdi) power station units 9-10 | JSW Energy | 270 | 1,596,699 | 0 | 2013 | Advanced development |
| Rajasthan | Kalisindh Thermal Power Station | Rajasthan RV Utpadan Nigam | 1200 | 7,096,441 | Supercritical | | Construction |
| Rajasthan | Kalisindh Thermal Power Station Stage II | Rajasthan RV Utpadan Nigam | 1200 | 7,096,441 | | | Proposed |
| Rajasthan | Kawai Thermal Power Project | Adani Power | 1320 | 7,806,085 | Supercritical | | Proposed |
| Rajasthan | Sakhigopal Ultra Mega Power Project | Power Finance Corporation | 4000 | 23,654,803 | | | Proposed |
| Rajasthan | Suratgarh Super Thermal Power Station | Rajasthan RV Utpadan Nigam | 2640 | 15,612,170 | | | Proposed |
| Rajasthan | VS Lignite Plant | KSK Energy Ventures | 135 | 798,350 | | 2010 | Operating |
| Tamil Nadu | Cheyyur Ultra Mega Power Project | Coastal Tamil Nadu Power | 4000 | 23,654,803 | | | Proposed |
| Tamil Nadu | Cuddalore SRM power station | SRM Energy | 1980 | 11,709,128 | | | Proposed |
| Tamil Nadu | Ennore power station expansion | Tamil Nadu Generation and Distribution Corporation | 1200 | 7,096,441 | | | Proposed |
| Tamil Nadu | Ennore SEZ Super Critical Thermal Power Project (Vayalur) | Tamil Nadu Generation and Distribution Corporation | 1600 | 9,461,921 | | | Proposed |
| Tamil Nadu | Chennai power station I | OPG Power Ventures | 77 | 455,355 | Subcritical | 2010 | Operating |
| Tamil Nadu | Chennai power station II | OPG Power Ventures | 77 | 455,355 | Subcritical | 2012 | Construction |
| Tamil Nadu | Chennai power station III | OPG Power Ventures | 160 | 946,192 | Subcritical | 2013 | Advanced development |
| Tamil Nadu | Chennai power station III additional expansion | OPG Power Ventures | 80 | 473,096 | Subcritical | 0 | Proposed |
| Tamil Nadu | Jayamkondam power station | Neyveli Lignite Corporation | 1600 | 9,461,921 | | | Proposed |
| Tamil Nadu | Marakkanam Super Thermal Power Project | NTPC | 4000 | 23,654,803 | | | Proposed |
| Tamil Nadu | Mettur Thermal Power Station Stage III | TANGEDCO | 600 | 3,548,220 | | 2012 | Construction |
| Tamil Nadu | Nagai Power project (Nagapattinam) | KVK Energy | 300 | 1,774,110 | | 2013 | Construction |
| Tamil Nadu | New Neyveli Thermal Power Station | Neyveli Lignite Corporation | 1000 | 5,913,701 | | 2015 | Proposed |
| Tamil Nadu | Neyveli TPS-II Expansion unit 1 | Neyveli Lignite Corporation | 250 | 1,478,425 | | 2011 | Operating |
| Tamil Nadu | Neyveli TPS-II Expansion unit 2 | Neyveli Lignite Corporation | 250 | 1,478,425 | | 2012 | Operating |
| Tamil Nadu | North Chennai Thermal Power Station - Stage-II Unit 1 | Tamil Nadu Generation and Distribution Corporation | 600 | 3,548,220 | Subcritical | 2012 | Construction |
| Tamil Nadu | North Chennai Thermal Power Station - Stage-II Unit 2 | Tamil Nadu Generation and Distribution Corporation | 600 | 3,548,220 | 0 | 2012 | Construction |
| Tamil Nadu | Tirunelveli power station | India Cements | 50 | 295,685 | | | Proposed |
| Tamil Nadu | Tuticorin power station (Coastal Energen) | Coastal Energen | 1200 | 7,096,441 | Subcritical | 2013 | Construction |
| Tamil Nadu | Tuticorin power station (Coastal Energen) Phases II and III | Coastal Energen | 1600 | 9,461,921 | Supercritical | 0 | Proposed |
| Tamil Nadu | Tuticorin Thermal Power Project | Tamil Nadu Generation and Distribution Corporation]] and [[Neyveli Lignite Corp | 1000 | 5,913,701 | | 2013 | Construction |
| Tamil Nadu | Tuticorin power station (Ind-Barath) Phase I | Ind-Barath Power (Madras) | 660 | 3,903,043 | 0 | 0 | Early development |
| Tamil Nadu | Tuticorin power station (Ind-Barath) Phase II | Ind-Barath Power (Madras) | 660 | 3,903,043 | 0 | 0 | Proposed |
| Tamil Nadu | Savarimangalam power station | SPR Infrastructure India | 2640 | 15,612,170 | 0 | 0 | Early development |
| Tamil Nadu | Udangudi power station | Tamil Nadu Generation and Distribution Corporation]] and [[Bharat Heavy Electricals Limited | 1600 | 9,461,921 | Supercritical | | Construction |
| Tamil Nadu | Uppur power station (Thiruvadanai) | Tamil Nadu Generation and Distribution Corporation | 1600 | 9,461,921 | 0 | 0 | Early development |
| Tamil Nadu | Vallur I Phase-II | NTPC]] and [[Tamil Nadu Generation and Distribution Corporation | 500 | 2,956,850 | | | Construction |
| Tamil Nadu | Vallur I power station | NTPC]] and [[Tamil Nadu Generation and Distribution Corporation | 1000 | 5,913,701 | | | Construction |
| Uttar Pradesh | Amauli Fatehpur power station | Uttar Pradesh Power Corporation]] and [[Neyveli Lignite Corporation | 2000 | 11,827,402 | | | Proposed |
| Uttar Pradesh | Anpara power station (Lanco) | Lanco | 1200 | 7,096,441 | Subcritical | 2011 | Operating |
| Uttar Pradesh | Anpara-C power station | UP Rajya Vidyut Nigam Ltd | 1200 | 7,096,441 | | 2011 | Operating |
| Uttar Pradesh | Anpara-D power station Unit I | UP Rajya Vidyut Nigam Ltd | 500 | 2,956,850 | | 2011 | Operating |
| Uttar Pradesh | Anpara-D power station Unit II | UP Rajya Vidyut Nigam Ltd | 500 | 2,956,850 | | | Construction |
| Uttar Pradesh | Anpara-E power station | UP Rajya Vidyut Nigam Ltd | 1320 | 7,806,085 | | | Proposed |
| Uttar Pradesh | Auraiya IGCC power station | NTPC | 300 | 1,774,110 | | | Proposed |
| Uttar Pradesh | Auraiya Unitech power station | Unitech Machines | 250 | 1,478,425 | | | Proposed |
| Uttar Pradesh | Bara Thermal Power Project | Jaiprakash Power Ventures | 3300 | 19,515,213 | | | Proposed |
| Uttar Pradesh | Bargarh power station | Bajaj Hindusthan | 1980 | 11,709,128 | | | Proposed |
| Uttar Pradesh | Barkera Mill power station | Bajaj Hindusthan | 80 | 473,096 | | | Proposed |
| Uttar Pradesh | Bilhaur Super Thermal Power Plant | NTPC | 1320 | 7,806,085 | | | Proposed |
| Uttar Pradesh | Bhognipur power station | Lanco | 2640 | 15,612,170 | 0 | 0 | Early development |
| Uttar Pradesh | Chola power station | Tata Power | 1320 | 7,806,085 | | | Proposed |
| Uttar Pradesh | Dadri power station 5-6 | NTPC | 980 | 5,795,427 | Subcritical | 2010 | Operating |
| Uttar Pradesh | Dopaha Power station | Uttar Pradesh Power Corporation | 1980 | 11,709,128 | Supercritical | | Proposed |
| Uttar Pradesh | Etah power station | Uttar Pradesh Power Corporation | 1320 | 7,806,085 | | | Proposed |
| Uttar Pradesh | Fatehpur power station | Uttar Pradesh Power Corporation | 1320 | 7,806,085 | | 2015 | Proposed |
| Uttar Pradesh | Feroz Gandhi Unchahar Power Project Stage IV | NTPC | 500 | 2,956,850 | | | Proposed |
| Uttar Pradesh | Harduaganj TPS Extn - Stage III (Kasimpur) | Uttar Pradesh Rajya Vidyut | 660 | 3,903,043 | Supercritical | | Proposed |
| Uttar Pradesh | Harduaganj TPS Extn -Stage II (Kasimpur) | Uttar Pradesh Rajya Vidyut | 500 | 2,956,850 | | 2011 | Operating |
| Uttar Pradesh | Jawaharpur power station | Jawaharpur Vidyut Utpadan Nigam | 1320 | 7,806,085 | | 2013 | Proposed |
| Uttar Pradesh | Lalitpur power project (Mirchawar) | Bajaj Hindusthan | 1980 | 11,709,128 | | 2014 | Proposed |
| Uttar Pradesh | Meja power station | NTPC]] and [[Uttar Pradesh Rajya Vidyut | 1320 | 7,806,085 | Supercritical | 2014 | Construction |
| Uttar Pradesh | Mirzapur power station | Welspun Energy | 0 | - | 0 | 0 | 0 |
| Uttar Pradesh | NCTPP IGCC demonstration (Dadri) | NTPC | 100 | 591,370 | | | Proposed |
| Uttar Pradesh | NCTPP Stage II (Dadri) | NTPC | 980 | 5,795,427 | | 2010 | Operating |
| Uttar Pradesh | Obra thermal station extension | UP Rajya Vidyut Nigam Ltd | 1800 | 10,644,661 | | | Proposed |
| Uttar Pradesh | Panki power station extension | UP Rajya Vidyut Nigam Ltd | 250 | 1,478,425 | | | Proposed |
| Uttar Pradesh | Parichha power station | Uttar Pradesh Rajya Vidyut | 500 | 2,956,850 | | 2011 | Construction |
| Uttar Pradesh | Rihand III power station | NTPC | 1000 | 5,913,701 | | | Proposed |
| Uttar Pradesh | Rosa Phase I power station | Reliance Power | 600 | 3,548,220 | | 2010 | Operating |
| Uttar Pradesh | Rosa Phase II power station | Reliance Power | 600 | 3,548,220 | | | Construction |
| Uttar Pradesh | Tanda power station expansion | NTPC | 1320 | 7,806,085 | | | Proposed |
| Uttar Pradesh | Singrauli Super Thermal Power Station Stage III | NTPC | 500 | 2,956,850 | | | Proposed |
| West Bengal | Adra Purulia power station | NTPC]] and [[Indian Railways | 1320 | 7,806,085 | | | Cancelled |
| West Bengal | Bakreswar Thermal Power Station Unit 6 | West Bengal Power Development Corp. | 660 | 3,903,043 | | | Proposed |
| West Bengal | Balagarh power station | CESC | 1320 | 7,806,085 | | | Proposed |
| West Bengal | Bankura Concast power station | Concast Bengal Industries | 20.5 | 121,231 | | | Proposed |
| West Bengal | Bhushan Steel West Bengal project | Bhushan Steel | 1000 | 5,913,701 | | | Unconfirmed |
| West Bengal | Durgapur Projects Limited power station 7A extension | Durgapur Projects Limited | 300 | 1,774,110 | | | Proposed |
| West Bengal | Durgapur Steel City power station unit 1 | Damodar Valley Corporation | 500 | 2,956,850 | | 2011 | Operating |
| West Bengal | Durgapur Steel City power station unit 2 | Damodar Valley Corporation | 500 | 2,956,850 | | 2012 | Construction |
| West Bengal | Farakka power station Unit VI | NTPC | 500 | 2,956,850 | | 2011 | Operating |
| West Bengal | Haldia Energy phase 2 | CESC | 1400 | 8,279,181 | | | Proposed |
| West Bengal | Haldia Energy power station | CESC | 600 | 3,548,220 | | 2014 | Proposed |
| West Bengal | Katwa Super Thermal Power Project (NTPC) | NTPC | 1600 | 9,461,921 | | | Deferred |
| West Bengal | Larsen & Tubro power station | Larsen & Tubro | 3200 | 18,923,843 | | | Proposed |
| West Bengal | Mejia power station phase II unit 1 | Damodar Valley Corporation | 500 | 2,956,850 | | 2010 | Operating |
| West Bengal | Mejia power station phase II unit 2 | Damodar Valley Corporation | 500 | 2,956,850 | 0 | 2011 | Operating |
| West Bengal | Raghunathpur power station phase 1 | Damodar Valley Corporation | 1200 | 7,096,441 | Subcritical | | Construction |
| West Bengal | Raghunathpur power station phase II | Damodar Valley Corporation | 1320 | 7,806,085 | Supercritical | | Proposed |
| West Bengal | Sagardighi Thermal Power Station Phase II | West Bengal Power Development Corp. | 1000 | 5,913,701 | Subcritical | | Proposed |
| West Bengal | Salboni 1 (CPP-IV) | JSW Bengal Steel | 300 | 1,774,110 | 0 | 2014 | Construction |
| West Bengal | Salboni 2 | JSW Energy | 660 | 3,903,043 | Supercritical | 2016 | Advanced development |
| West Bengal | Salboni 3 | JSW Energy | 660 | 3,903,043 | Supercritical | 2017 | Advanced development |
| West Bengal | Santaldih power station unit 6 | NTPC | 250 | 1,478,425 | | | Proposed |